System 1 Main Water Line Blowout

When it rains it POURS!

Late afternoon after our contractor got rained out and all valves were returned to normal. The water pressure on system 1 started dropping.
Later it was discovered we have a break in the main.
We have isolated the Mimbres section. Those residents along Mimbres will have no water overnight.
The contractor will be here at 7:30 am tomorrow to attempt a repair.

Also, the Aspen well was down due to the storm. We now have it pumping on "manual" control which should allow for water on the remainder of Sys 1 on the south side.
Hovenweep will be remaining on for the North side of the valley.
We apologize for any inconvenience.

Questions or concerns call:

Peter Veverka 829-3754